RUGGED COMPUTING, FIELD POWER & MOBILE INFRASTRUCTURE
Field systems designed to operate as one kit
TS2 Space combines rugged endpoints, edge computing, protected networking, power, charging, cases and mobile infrastructure around the users and environment.
COMPLETE FIELD WORKFLOW
The device, power and packaging must work together
Ingress protection and drop ratings matter, but so do sunlight readability, gloves, interfaces, battery logistics, thermal limits, data handling, repairability and the weight of the complete transport load.
Rugged computing
Laptops, tablets, handhelds and wearable interfaces selected around applications, environmental exposure, user input, ports and lifecycle support.
Edge and local data
Compact compute, storage and local processing for teams that cannot assume continuous cloud access or unlimited backhaul capacity.
Field power
Batteries, protected distribution, vehicle charging, generators and solar input sized from a realistic load profile and operating cycle.
Mobile infrastructure
Cases, racks, cabling, lighting, workstations, temporary shelters and spares organised for fast setup, accountability and recovery.

ENGINEERED FOR THE LOAD
Power autonomy starts with honest consumption
A dependable kit begins with the actual devices, duty cycle, peak loads, charging losses, temperature and resupply pattern. We calculate the power path before selecting a battery label or generator size.
- Device and accessory power inventory
- Runtime, charging-window and redundancy targets
- AC, DC, vehicle and renewable input options
- Cable, connector, fuse and distribution planning
- Transport, storage temperature and battery compliance
- Common spares and replacement strategy
DELIVERY MODEL
Configured, labelled and documented before dispatch
Profile
Users, software, data, climate, ingress, vibration, autonomy, transport and support.
Configure
Endpoint, compute, storage, networking, power, cases, cables and field spares.
Review
Classify encryption, high-performance computing, radio and specially designed configurations.
Commission
Load, test, label and document the kit with a practical support and replacement path.
PLAN A FIELD SYSTEM
Tell us what the team must run and for how long
Share the destination, users, applications, environment, runtime, charging options, transport limits and support requirement. We will define a practical system and confirm the appropriate supply route.
Service availability, performance and permitted use depend on location, network capacity, local regulation, selected equipment and service plan. Specifications and commercial terms are confirmed individually.
